Heavy Lift Crawler Crane
SANY SCC9000A-1, 900 T class, with superlift and luffing jib configurations for long-radius lifts.
Heavy lift cranes, ODC movement and project logistics.
An owned 900 tonne class crawler crane, support cranes and project logistics for turbine, refinery, metro and plant lifts.

Heavy lifts fail on planning, not on capacity. We own and crew a SANY SCC9000A-1 900 tonne class crawler crane and arrange the support fleet, transport and rigging around it — route survey, ground bearing checks, lift plan, mobilisation and demobilisation — so the lift window on your schedule actually holds.
SANY SCC9000A-1, 900 T class, with superlift and luffing jib configurations for long-radius lifts.
Hydraulic and crawler support cranes arranged for tailing, assembly and erection sequences.
Over-dimensional cargo movement with route survey, permits and escort coordination.
Lift plans, load charts, ground bearing pressure checks and certified riggers and signallers.
Trailer planning, assembly area preparation, erection and demobilisation of the crane itself.
Crane supplied with operator, rigging crew, maintenance and consumables on a monthly or per-lift basis.



We study the scope, site conditions, timelines and manpower or equipment load before quoting anything.
Method statements, EHS plan, statutory documentation and a mobilisation schedule you sign off on.
Deployed teams work under our own supervisors, with daily progress and safety reporting to your site head.
Checklists, test records and as-built documentation close the scope, with support through the defect-liability period.
Owned. The SCC9000A-1 is our asset — we maintain it, crew it and deploy it on our own projects as well as on client sites.
Load weight and dimensions, lift radius and height, site layout and ground condition. With those we can issue a configuration and a firm rate.
No. The crane goes out on an operated and maintained basis, which keeps the machine, the crew and the lift plan under one accountability.
The crane page carries the complete SCC9000A-1 specification, load moment figures and boom configurations.
Send the scope, location and timeline. You get a written scope, a mobilisation plan and a firm rate — usually within two working days.