RCC & Structural Works
Foundations, columns, beams, slabs and shear walls with shuttering, bar bending and concreting crews.
Civil, structural and industrial construction, delivered end to end.
Foundations, RCC structures, industrial sheds, roads and site development — planned, resourced and built by our own engineering and labour teams.

Narayani Associates takes construction packages from setting out to handover. We mobilise our own engineers, supervisors, skilled labour and plant, so a single contract covers planning, execution, safety and quality instead of splitting responsibility across several vendors. Work is executed to approved drawings and BOQ, with method statements agreed before the first pour.
Foundations, columns, beams, slabs and shear walls with shuttering, bar bending and concreting crews.
Plant buildings, warehouses, PEB sheds, admin blocks and utility structures.
Approach roads, internal roads, culverts, drains, levelling and hardstands for heavy plant.
Structural fabrication, welding and erection with certified welders and riggers.
Masonry, plaster, waterproofing and coordination with electrical and mechanical contractors.
Labour camps, stores, batching support, water and power arrangements for remote sites.



We study the scope, site conditions, timelines and manpower or equipment load before quoting anything.
Method statements, EHS plan, statutory documentation and a mobilisation schedule you sign off on.
Deployed teams work under our own supervisors, with daily progress and safety reporting to your site head.
Checklists, test records and as-built documentation close the scope, with support through the defect-liability period.
Both. We take labour-and-supervision contracts as well as full turnkey packages where we supply material, plant, manpower and supervision against an agreed BOQ.
Yes. Most of our work is at wind, solar and highway sites away from towns, so labour camps, stores, transport and site utilities are part of our standard mobilisation.
Every activity has a checklist and hold points. Concrete cube tests, material test certificates and stage-wise inspection records are maintained and shared with the client engineer.
For a defined scope we usually mobilise a core team within one to two weeks of a signed work order, and scale up as the front becomes available.
Send the scope, location and timeline. You get a written scope, a mobilisation plan and a firm rate — usually within two working days.